| 
Author:Mikhail Lebedev| Publications | 
|---|
 EasyChair Preprint 2914  |  EasyChair Preprint 2809  |  
 Keyphrasesautomated process control system, BIM technology, Equilibrium state of rock mass, Field study of the stress-strain state, Geomechanical and geophysical investigations, geotechnical monitoring2, geotechnical monitoring system, Geotechnical risks, Lining parameters, long-term operation, old tunnel lining, railway tunnel, reconstruction, repair, risk management, risk rating, rock pressure, severo muisky tunnel, stress-strain state2, transport tunnel, tunnel construction, underground structure, underground structure enclosing massif system.  |  
  | 
|